Global Gateway link

ContactContact

YouTube

SCADA* System

* The abbreviation for Supervisory Control And Data Acquisition

Main Features

Supervisory Control And Data Acquisition

The current status of the line is displayed, and a warning is issued when any condition becomes abnormal.

Control

The setting values and warning conditions for each control device can be changed from a computer to maintain appropriate production.

Data acquisition

The necessary data (temperature, pressure, flow rate, etc.) can be recorded.

Product Specifications

[System Control]

Ascertaining the Production Progress Status

  • Implements synchronized control of multiple lines.
  • Implements schedule control for production performance / production times.
    Ascertains the status of progress of each piece of equipment in multiple lines at any time.
  • Gives instructions on how to recover when abnormalities occur, and to reduce production losses.

[System Control]

Managing the Schedule (Production Capacity/Time)

  • Input the target number of portions to be produced, number of mixing batches, etc.
    → Automatic scheduling and the production processes for one day are displayed.
  • If multiple lines are being operated, the operation start time for each piece of equipment in the lines is indicated.
    → Losses can be reduced through synchronized timing lags.

[Monitoring]

Ascertaining the Operation Status of each piece of equipment

  • The operation status (motor speeds, time, temperatures, and errors that stop the equipment) is displayed for each piece of equipment.
  • Production management information such as batch numbers is displayed.

Contact Us

Related Information